Mine Flow Optimizer |
Mine Flow Optimizer (MFO)
Available in: Studio NPV Scheduler, Studio RM Scheduler
What is MFO?
Mine Flow Optimizer (MFO) represents a set of tools that aim to maximize NPV by adjusting annual mining rates, which is equivalent to cutoff grade optimization, simultaneously allocating material to their optimum destinations.
-
Find optimum pit limits and a block-by-block extraction sequence for given geological and economic parameters using one of the following methods:
-
Lerchs-Grossmann search to locate the economic limits to open pit and generate an NPV optimizing extraction sequence.
-
Resource-based search to find the optimum blended pit and a blended extraction sequence.
-
Convert the extraction sequence resulting from pit optimization into practical pushbacks, and a pushback-based extraction sequence by applying user-defined criteria like Minimum pushback size and Minimum access width.
-
Schedule the pushbacks, or any other pit sequence, to meet user-defined mining, haulage, processing and blending targets. A haulage simulation model can be defined with multiple ore and waste destinations which permits a one-step optimization of the life of a mine haulage plan. The optimal schedule is defined as another extraction sequence.
-
Reevaluate the schedule with Material Allocation Optimizer that accounts for time varying economic parameters, stockpiles and multiple blended products.
-
Reevaluate the schedule with Mine Flow Optimizer which adds cutoff grade optimization functionality to MAO.
-
Geological Risk Enabled NPV Scheduler+MFO imports the conditional simulation data to generate Risk Rated Pits and probability distributions of profits and NPV for any extraction sequence.
-
A block model defining geological and geochemical properties of the mineral deposit.
-
Economic parameters such as metal prices, mining and processing costs, metal recoveries, etc.
-
Optionally, an externally designed sequence of pushbacks to be scheduled.
-
Pit topographies (surfaces) viewable and exportable as 3D objects, contours and block model fields. In addition to Lerchs-Grossmann ultimate pit and phases, pushbacks and the scheduler annual pits, using Mine Flow Optimizer can generate any configuration of intermediate pits from all extraction sequences it produces.
-
Customizable spreadsheet reports and charts including pit specific reports, bench reserves and grade curves.
-
Viewable and exportable block models with cost/revenue information and pit definitions.
|
Related Topics |
|
Studio
NPVS Products
|
Copyright © Datamine Corporate Limited